Process Fired Heater for Shebelynka Refinery

Shebelynka Gas and Condensates Refinery in Ukraine

Novargi has been awarded of a contract to design and supply one Process Fired Heater (P-3 GFU-1) for the Public Joint Stock Company in Ukraine, UkrGasVydobuvannya for its Shebelynka Refinery.

The Process Fired Heater package P-3 GFU-1 mainly consists of one (1) horizontal tube-type designed to heat up two separate process streams and one (1) decoking system. The Process Fired Heater is a cabin type heater with horizontal tubes in both radiant and convection sections. The radiant section will be divided in two parts with an internal longitudinal firewall between them.

The supply shall also include Design, Manufacturing, Supply of goods, Testing, Inspection, Spare Parts, Training, Operating Service, Certification, Packing, Services and Documentation for the equipment fully in accordance with Project Specifications.

With this important project, Novargi strengthen its position in the Eastern European market and continues its growth in the international oil & gas industry.